I need some education, and would appreciate it here rather than the harder way of figuring it out on my own!
I need to run a water line about 1,000 feet through pretty sandy soil. No rocks at all that I expect.
I can rent a wall behind trench digger for 8 hours of run time for about $200. I'm looking at renting a Vermeer rtx250
Is this going to be a train wreck for using something like this to cover such a distance?
How much distance can you cover with one of those in an hour?
Otherwise, I figure with a shovel, i can be finished by October and probably drop about 40 lbs…
.